Installation
Neolith porcelain ceramic panels / quartz panels can be fixed in several ways:
1. HC system, with the panels bonded to the substructure:
1. Insulation,
2. “L” profile,
3. “T” profile,
4. Adhesive bead,
5. Double-sided adhesive tape,
6. Neolith panel.
2. VM system, with the panels fixed to the substructure with clips: